Customization: | Available |
---|---|
Rated Current: | 16A/32A/40A |
Operation Voltage: | 250V |
Still deciding? Get samples of US$ 75/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment methods: | |
---|---|
Support payment in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The EV charging cable is used in situations that socket of electric vehicle and socket of charging station doesn't match . We have different charging cable T1-T2, T2-T2, T2-GB/T.
Optional with 16A/32A, single phase and three phase.
Product Name | IEC-SAE Model 3 Charger |
Length | 5m or customized length |
Electrical Performance: | |
Rated current | 16A/32A/40A |
Operation Volatge | 250V |
Insulation resistance | more than 500M Ohm(DC500V) |
Contact resistance | 0.5m Ohm max |
Terminal temperature rise | less than 50K |
Withstand voltage | 2000V |
Mechanical Properties: | |
Mechanical life | no-load plug in/out more than 10000 times |
Coupled insertion force | 45N~100N |
Impact of external force | can afford 1M drop |
Environmental Performance | |
Operating Temperature | -30~+50ºC |
Applied Materials | |
Case material | thermoplastic, flame retardant grade UL94 V-0 |
Termminal | Copper alloy , silver plating |
Features | Easy: Charge at home, at work, or anywhere with the socket. No installation is required, just an intuitive pairing process. Plug and charge, wherever you are; Safe: Protecting Earthing detection; Designed for electric cars using the IEC 62196 standard, this car charger offers a maximum charging speed of 3.6 kW per hour. The precision engineering of the internal circuit board allows automatic detection and correction of any problems during charging, including any issues with minimal, unstable, or excessive voltage, current, frequency, earth leakage, and temperature even during lightning and electrical storms. |
Jiangsu Zilong New Energy Technology Co., Ltd. was established in March 2020. Located in the beautiful Suzhou, close to Shanghai, the factory covers an area of 28,000 square meters.
We are a high-tech production enterprise integrating R&D, design, production, sales and service. The main products are: new energy vehicle charging product series (gun/seat/mode 2/wiring harness/control unit), auto molds and injection molding products. The company has strong R&D and design strength, sophisticated production technology, and excellent after-sales service. At the same time, it cooperates with authoritative institutions such as Hefei University of Technology to continuously innovate and create excellence, continuously introduce new products, continuously apply new technologies, and strive for excellence, always climbing the commanding heights of the industry.
In November 2020, it passed the ISO9001 quality management system certification, and in December 2020, it passed the CQC certification, and the IATF16949 automotive product quality system is under application.
The company has a total of 38 intellectual property applications, 11 of which have been authorized/registered, including 4 invention patents, 8 design patents, 1 integrated circuit, and 2 trademarks
The company has become the designated supplier (secondary) of passenger cars such as SAIC, JAC, Chery, etc., and directly supplies WM Motor, and also closely cooperates with State Grid (Xu Ji).
Q1.Are you a factory or trading company?
A: We are a professional manufacturer of new and sustainable energy applications .
Q2.What is the warranty?
A: 12 months. In this period, we will supply technical support and replace the new parts by free, customers are in charge of delivery.
Q3. What is your terms of packing?
A: Generally, we pack our goods in brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q4. What is your terms of payment?
A: T/T 50% as deposit, and 50% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q5. What is your terms of trade?
A: EXW, FOB, CFR, CIF, DAP,DDU,DDP
Q6. How about your delivery time?
A: Generally, it will take 3 to 7 working days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q7. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q8. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q9. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.
Q10.What's the difference between Movable Charger and Wallbox Charger?
A: In addition to the obvious appearance difference, the main protection level is different: wallbox charger protection level is IP54, available outdoors;And the Movable Charger protection level is IP43, rainy days and other weather can not be used outdoors.